Most of the processing capacity tied to Venezuela’s Orinoco Mining Arc is state-run: gold plants and mines of Minerven (part of the CVG holding) and the aluminum and steel plants of Guayana, all in Bolívar state, according to the USGS. The Arc itself covers 111,843.70 km², 12.2% of the country, and was created by decree 2,248 of February 24, 2016.

This page is about the plants and the obstacles around them. The Arc’s geography is in Orinoco Mining Arc; the full plant list, in mineral processing plants in Venezuela; how much capacity is used, in Spanish, in procesamiento de minerales en Venezuela.

What is processed there

What the 2026 law says about processing

Processing is an “ancillary activity” to mining (article 56): grinding, drying, mixing, purification, concentration, smelting and transformation. Small-scale mining processes between 1 and 350 tons a day (article 80) and large-scale mining more than 4,400 (article 82). Artisanal mining is limited to Venezuelan citizens with a license and “rudimentary” extraction and processing techniques (article 83). For critical minerals and rare earths, an export tax of up to 5% applies (article 98), and the law does not list which minerals those are.

The obstacles that are documented